Large new build house in Hertfordshire - Case study

When our clients Orley and Jonathan found a house in Bushey, Hertfordshire, they instantly fell in love with the location and the setting. Still, they knew they would need to make significant changes to create the perfect family home they have been desiring. The original building, a chalet built in the 1960s, was very old fashioned, with small dark rooms, so they hired our Marriott Construction company to demolish the old property and build a much larger, brighter mansion in its place. Designed by Stanley Architects and constructed from start to finish by our skilled team of builders and decorators, this beautiful house features floor to ceiling glazing and easy access to the garden through sliding glass doors.

Luxury New Build Home Construction

Demolition and ground preparation

The original house had to be demolished, leaving just two walls as per architect's instruction. We then prepared the foundations and piling before moving onto the next step.

Wall construction

After completing the foundations and putting in place all the safety measures, we moved onto the construction of the walls. Only the highest quality weatherproof blocks and bricks have been used.

Preparing for the construction

After installing heavy-duty wood and metal roof trusses to ensure that the pitched roof will last for generations, our roofer had laid felt and top quality roof tiles over the trusses.

Fitting the glazing

Next, we fitted the floor to ceiling glazing to the central part of the house as well as sliding glass doors on each side to connect the house with the garden and to allow natural light into the new luxurious family home.

Kitchen Fitting, Plumbing and Electrics

The electrical engineer prepared all the electrical fixes throughout the house to prepare for the fitting of the interiors. We made the kitchen area ready for the bespoke hand made shaker cabinets and the kitchen island to be fitted by Mark Wilkinson. We then sourced bespoke marble kitchen worktops and splashbacks for our clients and laid matching marble floor tiles.

Completion

Upon completion of this luxury new home and its interiors, we have issued our clients with all the relevant building certificates as well as a fifteen-year structural warranty.